The revenue recognition engine built for the messy reality of SaaS contracts โ€” multi-element arrangements, milestone billing, contract modifications, and period close, all handled with auditor-ready precision.

5
Complex scenarios handled
3
Period close paths
100%
SSP allocation accuracy
0
Manual journal entries

On this page

ASC 606 Core EnginePeriod Close โ€” 3-PathFX Treatment EngineChurn & ContractionAI Agents
๐Ÿ“‹

ASC 606 / IFRS 15 Core Engine

Allocates contract value across performance obligations, recognises revenue on the correct schedule, and handles contract modifications the way your auditor expects โ€” without a single manual journal entry.
๐Ÿ“

SSP allocation

Allocates contract value across performance obligations using standalone selling price โ€” the foundation of compliant multi-element arrangements.

๐Ÿ”„

Modification accounting

Distinguishes prospective vs cumulative catch-up treatment automatically based on the nature of the contract change.

๐Ÿ—๏ธ

Milestone recognition

Multi-milestone POs are recognised obligation-by-obligation as work is completed โ€” never booked all upfront.

๐Ÿ“Š

Deferred revenue waterfall

An auto-updating schedule shows recognized vs deferred revenue at any point in time, for any contract or cohort.

5 scenarios Fincelo handles natively

ScenarioStandard treatment
Multi-element arrangementsSSP-based allocation across performance obligations
Contract modificationsProspective vs cumulative catch-up, determined automatically
Milestone billingRecognition tied to performance completion, not invoice date
Variable considerationConstrained estimate with quarterly true-up
Material rightsIdentified in the contract and allocated separately
๐Ÿ”

Period Close โ€” 3-Path Resolution

Materiality-based close logic decides whether a backdated entry needs a simple post, a split treatment, or a full reopen with dual approval โ€” and checks GSTR-1 conflicts only when it actually matters.
A

Immaterial โ€” post to current

Entries below the materiality threshold (typically under 10% of period revenue) post directly to the current period โ€” no friction for small adjustments.

B

Split treatment

Borderline entries split between current and prior period, with CFO visibility but no blocking approval.

C

Reopen with dual approval

Material entries trigger prior-period reopening, requiring CFO and Controller sign-off before the books move.

๐Ÿ›ก๏ธ

GSTR-1 conflict check โ€” Path C only

Only Path C checks whether the prior period's GSTR-1 has already been filed. Paths A and B never trigger this check, because the materiality threshold means they can't create a compliance conflict.

The 3 paths in detail

PathMaterialityApproval requiredGSTR-1 check
A< 10% of period revenueNoneNo
BBorderlineCFO notifiedNo
C> 10% of period revenueCFO + ControllerYes โ€” only if prior period GSTR-1 already filed
๐Ÿ’ฑ

FX Treatment Engine

IAS 21 and ASC 830 compliant foreign currency handling for multi-currency contracts โ€” recognition, remeasurement, and gain/loss reporting handled automatically.
๐Ÿ“…

Locked invoice rate

The RBI reference rate is locked at the invoice date for GST compliance, and stored permanently against that document.

๐Ÿ”

Period-end remeasurement

Monetary balances are remeasured at the period-end spot rate automatically โ€” no manual FX journal entries.

๐Ÿ“Š

FX gain/loss report

Realized and unrealized FX gain/loss broken out by customer and currency, ready for your finance review.

๐ŸŒ

Multi-currency books

INR statutory books are maintained alongside functional currency reporting, side by side.

โ†ฉ๏ธ

Churn & Contraction

ARR and revenue recognition are kept fully independent. Six distinct scenarios โ€” from no-refund churn to mid-bundle module removal โ€” each handled with the correct accounting treatment.
View A

No refund issued

Revenue continues to be recognised through the original contract end date, even after the customer has cancelled.

View B

Refund issued

Revenue recognition stops at the termination date, and a credit note is issued for the unused period.

๐Ÿค–

AI clause scan

Scans the contract for no-refund clauses and suggests the correct view โ€” the CFO always makes the final call, logged with name and timestamp.

๐Ÿ“ฆ

Bundle contraction

Module removal from a bundle triggers SSP reallocation across the remaining modules automatically.

6 churn and contraction scenarios

ScenarioTreatment
Full churn, no refundRevenue continues to original contract end date
Full churn, with refundRevenue stops at termination date, credit note issued
Partial seat reductionRecorded in a separate contraction ARR bucket
Module removal from bundleSSP reallocation across remaining modules
Mid-term downgradePro-rated recognition adjustment from the effective date
Non-renewalARR decrements on the actual contract end date
๐Ÿง 

AI Agents at work here

This module doesn't just record data โ€” Fincelo's autonomous AI agents act on it every day, without anyone pressing a button.
๐Ÿ“… Period Close Agent

Resolves period close conflicts

Auto-classifies every recognition catch-up into Path A, B, or C, checks GSTR-1 filed-return status before reopening a closed period, and routes for CFO/Controller approval where required.

๐Ÿ“ˆ Revenue Anomaly Agent

Flags recognition drift before close

Continuously compares recognized revenue against contract schedules and FX-adjusted forecasts, surfacing anomalies days before month-end instead of during the audit.

Other modules

See ASC 606 / IFRS 15 Engine on your own contracts

20 minutes. Your actual data. No generic demo.